Mr Sukardi's home in Gunungkidul, rebuilt
A full rebuild for Mr Sukardi in Gunungkidul, Yogyakarta.
Total cost
Rp35,451,000
Finished
20 June 2026
Build time
36 days
Location
Gunungkidul Regency, Yogyakarta
Drag the line across the photo to compare.
Bapak Sukardi, Living with a disability in a house badly damaged by an earthquake and never repaired.
Living with a disability in a house badly damaged by an earthquake and never repaired.
With our donors, we rebuilt this house into a home that is safe, healthy and fit to live in: a reinforced structure, a light-steel roof, tiled floors, a new toilet and washroom, and fresh wiring.
Thank you to every donor who made this family's new home possible.
| Category | Item | Amount |
|---|---|---|
| Materials | Cement, sand and bricks | Rp9,595,000 |
| Materials | Light-steel roof frame and tiles | Rp8,282,000 |
| Materials | Floor tiles and toilet | Rp3,434,000 |
| Materials | Door and window frames | Rp3,131,000 |
| Builders' wages | Builders' and labourers' wages | Rp7,878,000 |
| Transport | Hauling materials to site | Rp1,212,000 |
| Other | Wiring and clean-water connection | Rp1,919,000 |
| Total | Rp35,451,000 | |