Mrs Sumiati's home in Tangerang, rebuilt
A full rebuild for Mrs Sumiati in Tangerang, Banten.
Total cost
Rp30,888,000
Finished
9 October 2026
Build time
21 days
Location
Tangerang Regency, Banten
Drag the line across the photo to compare.
Ibu Sumiati, A street seller of herbal drinks whose kitchen and bathroom have collapsed.
A street seller of herbal drinks whose kitchen and bathroom have collapsed.
With our donors, we rebuilt this house into a home that is safe, healthy and fit to live in: a reinforced structure, a light-steel roof, tiled floors, a new toilet and washroom, and fresh wiring.
Thank you to every donor who made this family's new home possible.
| Category | Item | Amount |
|---|---|---|
| Materials | Cement, sand and bricks | Rp8,360,000 |
| Materials | Light-steel roof frame and tiles | Rp7,216,000 |
| Materials | Floor tiles and toilet | Rp2,992,000 |
| Materials | Door and window frames | Rp2,728,000 |
| Builders' wages | Builders' and labourers' wages | Rp6,864,000 |
| Transport | Hauling materials to site | Rp1,056,000 |
| Other | Wiring and clean-water connection | Rp1,672,000 |
| Total | Rp30,888,000 | |